EMMA
Jump to navigation
Jump to search
Information on EMMA DAQ
General info
- https://midemma01.triumf.ca - EMMA MIDAS DAQ
- https://midemma01.triumf.ca/rootana/ - EMMA analyzer
- https://elog.triumf.ca/EMMA/ - EMMA elog
EMMA DAQ computers
- midemma01 - main daq computer in the ISAC2 CR#2 (TIGRESS)
- midemma02 - terminal in ISAC2 on the table next to the EMMA platform
- lxemma01 -EMMA VME processor (in the VME crate on the EMMA platform)
Storage:
- 10TB ZFS volume on midemma01 mounted on the ISAC cluster machines as /emma/data1/emma
DAQ instructions
To start the DAQ:
- login emma@midemma01
- run "mhttpd -D"
- open web page https://midemma01.triumf.ca
- go to the Programs page, start all programs in order
- go to the Status page, start a run, stop a run
To start the analyzer:
- login emma@midemma01
- cd online/ana
- run ./emmana.exe -g -R8081
- if a run is active, watch the histograms update every 15 seconds on the canvases
- open web page: https://midemma01.triumf.ca/rootana/ (tailing slash is important!), watch the histograms on the web, click "monitoring" to enable periodic update.
- to rebuild the analyzer, edit emma_module.cxx, then run "make". Use "make clean" to remove old object files, etc. Commit changes using "git commit ."
To change PID gates:
- Open emma_module.h located in midemma01:~/packages/EMMA-Collaboration/emmana/include
- modify values in lines 32 to 56. Specifically, variables called Total_E_low & Total_E_high, eICtot_min & eICtot_max, for the ICsum+Silicon and ICsum gates, respectively.
- Save and stop/start rootana from the midas programs page.
TDC Channels
TDC Channel | Signal |
---|---|
[0] | PGAC Anode Top |
[1] | PGAC Anode Middle |
[2] | PGAC Anode Bottom |
[3] | PGAC Cathode Right |
[4] | PGAC Cathode Left |
[5] | PGAC Cathode Top |
[6] | PGAC Cathode Bottom |
[7] | Trigger (OR of Anodes) |
[8] | ISAC RF |
FAQ
If the DAQ crashes here are some suggested diagnostics checks:
- Check connection to feemma (VME crate): Type "ping lxemma01". If it does not respond then power cycle the VME crate at the focal plane.
- Check the status of the mlogger program: Sometimes an interrupted connection can cause problems with the mlogger program, which will result in being unable to restart a new run. Type "ps aux | grep mlogger". If multiple mlogger programs are running then midemma01 will need to be restarted. You must perform a hard restart by holding down the power button.
- Once both midemma01 and the VME crate are back up and running, follow the DAQ restart instructions listed above or type "start_daq.sh" in terminal.
Manuals
- TDC V1190 Manual:
- MADC-32 Manual:
Contact
- Barry - davids
- Matt - mwilliams
- Martin - malcorta
- Konstantin - olchansk (daq group)
- Thomas - lindner (daq group)
Other info
- main account: emma@ISAC-NIS (physically on isdaq00)
- data directory: /home/emma/Experiments (physically on isdaq01)
online analyzer can be invoked from any directory using emmana.exe .