Back Midas Rome Roody Rootana
  Midas DAQ System  Not logged in ELOG logo
Entry  11 Mar 2019, Francesco Renga, Forum, Run length 
    Reply  12 Mar 2019, Stefan Ritt, Forum, Run length 
    Reply  12 Mar 2019, Pierre Gorel, Forum, Run length 
    Reply  13 Mar 2019, Konstantin Olchanski, Forum, Run length 
Message ID: 1486     Entry time: 12 Mar 2019     In reply to: 1484
Author: Stefan Ritt 
Topic: Forum 
Subject: Run length 
> Is there a way to start the short run exactly 1 h after the starting 
> of the previous short run?

This is not possible with the current sequencer.
ELOG V3.1.4-2e1708b5