Back Midas Rome Roody Rootana
  Midas DAQ System  Not logged in ELOG logo
Entry  27 Feb 2007, Piotr Zolnierczuk, Forum, event builder scalability 
    Reply  27 Feb 2007, Stefan Ritt, Forum, event builder scalability 
    Reply  27 Feb 2007, John M O'Donnell, Forum, event builder scalability 
       Reply  27 Feb 2007, Stefan Ritt, Forum, event builder scalability 
    Reply  02 Mar 2007, Kevin Lynch, Forum, event builder scalability 
       Reply  03 Mar 2007, Piotr Zolnierczuk, Forum, event builder scalability 
          Reply  03 Mar 2007, Stefan Ritt, Forum, event builder scalability 
Message ID: 355     Entry time: 27 Feb 2007     In reply to: 353     Reply to this: 356
Author: John M O'Donnell 
Topic: Forum 
Subject: event builder scalability 
At Los Alamos, we have 15+1 frontends - the 15 between them read about 2 or 3
TB/hour and reduce it to 1 to 5 GB/hour which is then sent to the mevb on a 17th
computer.  The 16th frontend handles deadtime issues and scalers (small data rate).

frontends are 1GHz pentium 3, and backend is 2.8GHz dual CPU with hyperthreading.
Interconnect is 100Mb ethernet from frontends to switch, and 1Gb ethernet from
switch to backend.

Our bottle neck is (a) compactPCI backplane reading data from waveform digitizers
to the frontend CPUs and (b) CPU power on the frontend CPUs to analyzer the waveforms.

John
ELOG V3.1.4-2e1708b5